System Development and Analysis
Executive Summary – In this research project report includes
the conceptual system design for distributing company name as CGC. Citizen’s
Gas Company is gas Distribution Company who supplies gas to the residential,
commercial and industrial customer. Company some time face the problem of short
supply of gas. In order to fulfil the demand of gas company curtails the supply
of industrial customer to meet the demand of other customer, whereas sometime
over supply of gas is stored in storage field. Currently to meet the demand of customer
at the time of short supply company use the gas stored in storage field though
some time storage also not sufficient to meet demand. Therefore to reduce all
the problem of non availability of gas, CGC appointed corporate director for
planning and conceptual system design. Hence in research report we will cover
the planning and conceptual system design that helps to meet supply and demand
of company.
Introduction – In the
research report we cover the conceptual system design for CGC which helps to meet
the demand and supply of the company. Plan includes the detail report which
helps to decision making about it. CGC have a business of purchase and sales of
natural gas. Customer strength of CGC is 2, 00,000 and from that 1, 60,000
customer is residential customers which is 80% of total customer, whereas
38,000 customers is from commercial field and only 2000 customers are from industrial
use. Company serve to the customer by purchasing gas from various suppliers
based on different contracts between CGC and suppliers. Some contracts with
suppliers is about the equivalent monthly instalment where suppliers provide
equal gas in each months, whereas in some contract supplies depend on
availability of gas based on heating season. In orders to meet all the demand
to customer, CGC going to develop conceptual system design hence in the project
report we covered the development of conceptual system design, implementation
of system, cost and benefit from developed system etc.
System Development – In order to
develop the system that can meet all the demand of CGC and add new required
feature in CGC, we are going to develop system by using SDLC approach of system
development. In system development approach we will understand the needs of CGC
from system being developed and expectation of executive from system. Based on
executive’s expectation we will develop the system which can meet the demand of
CGC. From the following way we will develop the system –
System Requirement Analysis (SRS) – System
requirement analysis is initial level of system development. In this phase we
will understand the expectation of CGC from new system. For analysis of user’s
expectation we will draft questionnaire or conduct interview with users. Draft
questionnaire will be objective type of which answered by users. Based on
answer received from user, we will understand the feature required on the
system. Other way to analyse the system is meeting in which we will conduct
with the user of system and based on their expectation from system. In the
given case it is very clear that we have to develop the system which can
provide the accurate report about the demand and supply of gas. As we know CGC
purchased gas from contractor and sales it to the supplier hence first report
from system is about the sales to customer and purchased record from
suppliers. Secondly CGC have need to
match demand with supply hence there is no need to curtail demand to customer.
In order to meet demand with supply, system should provide the report of
storage available with us and additional storage needed to meet demand during
the year. From the analysis of requirement of CGC, we have got following
expectation of CGC from new system.
·
System should have
capability to analyse the past record of company and based on past record
system should generate the report about expected demand of Gas during the year
based on the analysis and report we can expect the storage needed.
·
System should be able
to generate report with classification of types of customer in previous year,
their demand in previous year hence based on detail and past analysis we can
add some storage additionally to meet the demand.
·
System should be able
to match demand with supply generate based on that which help to maximum
storage we have needed.
·
It also have capability
to analyse the cost and benefit from storage as some time storage will take
higher cost hence we may not be able to met demand rather we curtail demand.
Hence cost benefit analysis also embedded in the system.
·
Developed system also
have function of prior notification if available storage is not sufficient to
meet demand hence CGC should take care about the storage of gas.
·
System should also have
capability to books demand in advance basis so that CGC can store the required
amount of gas in storage.
|
Months
|
Opening balance in
storage
|
Purchased New Supply
|
Sales to Customer
|
Closing balance of Gas
|
Expected Demand
|
Sufficiency of demand
|
|
January
|
97000.00
|
35000.00
|
48000.00
|
84000.00
|
47000
|
37000.00
|
|
February
|
84000.00
|
56000.00
|
47000
|
93000.00
|
49000
|
44000.00
|
|
March
|
93000.00
|
106000.00
|
49000
|
150000.00
|
78000
|
72000.00
|
|
April
|
150000.00
|
130000.00
|
78000
|
202000.00
|
87000
|
115000.00
|
|
May
|
202000.00
|
123000.00
|
87000
|
238000.00
|
98000
|
140000.00
|
|
June
|
238000.00
|
135000.00
|
98000
|
275000.00
|
110000
|
165000.00
|
|
July
|
275000.00
|
139000.00
|
110000
|
304000.00
|
86000
|
218000.00
|
|
August
|
304000.00
|
144000.00
|
86000
|
362000.00
|
137000
|
225000.00
|
|
September
|
362000.00
|
120000.00
|
137000
|
345000.00
|
120000
|
225000.00
|
|
October
|
345000.00
|
87000.00
|
120000
|
312000.00
|
142000
|
170000.00
|
|
November
|
312000.00
|
65000.00
|
142000
|
235000.00
|
90000
|
145000.00
|
|
December
|
235000.00
|
45000.00
|
90000
|
190000.00
|
110000
|
80000.00
|
|
|
|
1185000.00
|
1092000.00
|
|
1154000.00
|
|
Based on this kind of report
organisation can predict the storage needed to met with future demand.
Diagram reveals the demand and supply of
the organisation. In the same manner another report reveals the expected demand
for one month and current storage. Also notify if current storage is not
sufficient to meet demand.
Demand and supply report, expected
demand and available storage all the report are needed from the system, which
should be like the report prepared on the assignment.
System Design – After the
analysis of whole feature which is needed in the system we will move to the next
phase of system development is system design.
In system design phase we will follow the information gathered from
system analysis phase as system will be design based on information and
expectation of CGC received from system requirement phase. Once the system
being design by considering the CGC expectation, it should be shown to the
executive of CGC. Based on any changes
needed to the executive, we will develop prototype which is sample of system.
Prototype is used by the CGC for few days so that executive of CGC can
understand the compatibility of system, loopholes and weakness of system and
any more needed in the system. After feedback received from the users of CGC we
will change and add in the system accordingly. New system should be fully
equipped with the requirement of CGC.
System Evaluation and cost
benefit analysis
– Before installation and development we should aware about the benefit and
cost from the system as if benefit from system is more than cost then only we
will move towards development otherwise development project of system should be
placed on hold. In evaluation phase first we will analyse the cost and benefit
from the system by considering annual benefit from the system, maintenance cost
of system, system development cost and any other benefit and cost from the
development of system.
|
CGC
|
||||||||
|
Cost benefit Analysis for
New System development of CGC
( Amount in $)
|
||||||||
|
|
Years
|
|||||||
|
Cost
|
0
|
1
|
2
|
3
|
4
|
5
|
6
|
Total
|
|
|
|
|
|
|
|
|
|
|
|
System Development Cost
|
75000.00
|
|
|
|
|
|
|
75000.00
|
|
System Operating Cost
|
|
20000.00
|
22000.00
|
24200.00
|
26620.00
|
29282.00
|
32210.20
|
154312.20
|
|
|
|
|
|
|
|
|
|
|
|
Total Cost
|
75000.00
|
20000.00
|
22000.00
|
24200.00
|
26620.00
|
29282.00
|
32210.20
|
229312.20
|
|
|
|
|
|
|
|
|
|
|
|
benefits
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tangible benefit from
System
|
|
25000.00
|
27500.00
|
30250.00
|
33275.00
|
36602.50
|
40262.75
|
192890.25
|
|
Reduction in storage cost
|
|
2500.00
|
3630.00
|
3993.00
|
4392.00
|
4831.53
|
5314.68
|
24661.21
|
|
|
|
|
|
|
|
|
|
|
|
Total benefit
|
|
27500.00
|
31130.00
|
34243.00
|
37667.00
|
41434.03
|
45577.43
|
217551.46
|
|
|
|
|
|
|
|
|
|
|
|
Net Cash flow
|
-75000.00
|
7500.00
|
9130.00
|
10043.00
|
11047.00
|
12152.03
|
13367.23
|
-11760.74
|
|
Discount factor @10%
|
|
1.00
|
0.91
|
0.83
|
0.75
|
0.68
|
0.62
|
|
|
|
|
|
|
|
|
|
|
|
|
Discounted Cash Flow
|
0
|
7500
|
8308.3
|
8335.69
|
8285.25
|
8263.38
|
8287.683
|
48980.30
|
|
Cumulative cash Flow
|
0
|
7500
|
15808.3
|
24143.99
|
32429.24
|
40692.62
|
48980.3
|
|
|
|
|
|
|
|
|
|
|
|
|
Net Present Value
|
48980.3
|
|
|
|
|
|
|
|
From the above analysis it is very clear
that company will be beneficial from the system implementation. As company have
incurred high amount of cost in year 0 which will be recovered in next 6 years
of company business. Hence we will develop system according. Evaluation of
system development reveals that from development of new system company have
profit of $48980 within six year. For analysis we assume that new system have
life of six year.

With the financial benefit from the
system development we also considered the non financial benefit from the system
as well –
Decision making
– Developed system will help in decision making about the storage capacity of
the company.
Customer Satisfaction- With developed system we need not
to curtail customer demand which leads to satisfaction of customer. Also
fulfilment of demand customer as and when required will help to increase the
customer towards CGC.
Quick report
– New developed system provide report as and when needed even it can provide
report in urgency as well.
Accurate report
– Report generated from the newly developed system will provide accurate report
hence chances of inaccuracy and inefficient decision will reduce at lower
level.
System development – Once we are
fully sure about the benefit from system development we will move towards the
development of system. At the time of system development we will use the
prototype which we last develop after modification. If any additional demand rose
by executive, we will add into the system at the time maintenance.
System implementation- In the system implementation phase we will
implement the system in CGC gradually as implementation of whole system by
replacing existing system is little beat risky for the organisation. Direct
implementation cause loss of data some time hence we will use the
implementation by phase. In
implementation of system we also provide training to the users of CGC.
System maintenance
- Development of system is not sufficient to use the system in proper manner
hence in order used the system regularly it should be maintained as and when
needed.
Data which should
incorporated in the new system of CGS and importance of
incorporated data in the system-
Now company serving to the 200000 customer
in total, of which includes different category of customer like industrial,
commercial and residential. From all the customer strength 80% customer are
from residential group. As we know that demand of gas is not equivalent in
whole year. From some of suppliers we receive our gas based on equivalent
instalment of monthly basis and some suppliers provide the gas based on
availability with them. Availability of gas depends on heating, weather and
some more factors. It is given that demand of gas of residential customer
depends on the weather condition whereas demands of industrial customers depend
on the business related factors, in the same manner supplies from suppliers
also fluctuating over the year. So it is very complex for the company to
maintain the storage according to the demand, as due to certain factors it is
very difficult to predict the demand in prior. If company predicts the demand
from customer in prior manner then CGC may fulfil the customer demand from
storage as prior demand helps to store adequate gas in to storage. It is very
clear that now to meet customer Demand Company curtail the demand of industrial
customer. Hence to meet sufficient demand of customer organisation should use
information system which helps to predict demand in prior manner based on past
data, whether and other factor which is relevant for prediction. In order to
use the system we have many other inputs also needed then only system can
provides output to us. Based on all the analysis we reach to the conclusion
that CGC have to provides following data for system input –
·
In the case of CGC, it
is provided that company received the gas from number of suppliers, from which
CGC entered into the contract. CGC paid to the suppliers according to the clause
of contract between the suppliers and CGC even consumed any amount of gas.
Hence in order to gather all the information about it, CGC should collect all
the actual supply from the suppliers in the past years and compared the supply
with demand from customer. From both demand and supply we can get the variance
between demand and supply. If variance is positive then it will be stored into
storage and if variance is negative then it is short fall in supply which is
used from storage. If past analysis in this manner reveals, even storage also
inadequate to meet demand then CGC should add storage by more quantity equal to
short fall. This calculation helps to CGC
for understanding about the supplier’s capabilities. If supplier’s capability
looks inadequate then CGC may arrange from other suppliers. This analysis helps
to understand the needs of additional storage.
·
For analysis of cost
and benefit from storage system should have storage cost as well. Hence storage
cost should also be considered in report of cost and benefit from the storage. As
it is very clear that prior understanding of demand motivates to CGC for store
sufficient amount of gas into storage but if storage is increased with the cost
of storage also increased. So it is necessary to analyse the cost and benefit
from storage prior to store it. Input of storage cost helps to analyse the
maintenance cost of storage.
·
Company normally
curtails the demand of industrial user by looking to the number of customer but
when we look at the total revenue then CGC get 26% of total revenue from
industrial customers. So, in order to meet the demand of industrial customer,
CGC should analyse the demand and supply by gathering information. To meet the
demand of industrial customer, CGC should input accurate supply information in
the system. Reduction of supply lead to
curtail the demand of industrial customer due to low margin customer but when
we curtail the demand of customer regularly then it will cause reduction of
trust of customer.
·
Report preparation
includes the budget as well hence in order to prepare the budget of company it
is also necessary to provide the information which is relevant for budget.